Dubai Water Canal: 10 marine transport stations, 3 pedestrian bridges to be constructed

28/05/2016 (Emirates 24/7 – UAE): Roads and Transport Authority (RTA) has awarded a contract for Phase 4 and 5 of the Dubai Water Canal Project. According to the contract, which amounts to Dh703 million, works in both phases are set for completion by the end of September this year. Highlighting the latest phases of the project, Mattar Al Tayer, Chairman of RTA said: “Phase 4 of the Dubai Water Canal project, which costs about Dh307 million, is part of infrastructural works required to serve property development areas on both sides of the Canal, including roads & utility lines. “The Canal stretches 3.2 km from the Business Bay Canal up to the Arabian Gulf via the Sheikh Zayed Road (SZR), Al Wasl Road and Jumeirah Road. “Projects to be constructed on the Water Front will be served by modern water transport means, and result in improved quality of water in the Dubai Creek…

http://www.emirates247.com/news/dubai-water-canal-10-marine-transport-stations-3-pedestrian-bridges-to-be-constructed-2016-05-28-1.631343

________________________________________________________________________________

Annunci

Rispondi

Inserisci i tuoi dati qui sotto o clicca su un'icona per effettuare l'accesso:

Logo WordPress.com

Stai commentando usando il tuo account WordPress.com. Chiudi sessione / Modifica )

Foto Twitter

Stai commentando usando il tuo account Twitter. Chiudi sessione / Modifica )

Foto di Facebook

Stai commentando usando il tuo account Facebook. Chiudi sessione / Modifica )

Google+ photo

Stai commentando usando il tuo account Google+. Chiudi sessione / Modifica )

Connessione a %s...